Cabinet Secretary Benhur Abalos called for the imprisonment of those responsible for substandard flood control projects in Bulacan after inspecting damaged seawalls in Paombong.
Abalos said the failed structures left communities vulnerable to severe coastal flooding and demanded transparency and accountability.
The DPWH identified several flood control projects in the area, including structures built by blacklisted contractors and one project that remains unfinished.
Public Works Secretary Vince Dizon said contractors may be required to repair damaged structures under their warranties, while stronger seawalls and hexapods will be installed in vulnerable areas.
The government also plans long-term solutions, including a Pampanga River Basin master plan and the proposed Manila Bay Coastal Defense Dike.
Source: PhilNews24 | August 24, 2026
Latest from Politics
Ako Bicol Party-list denied involvement in the reported P3.7-billion increase in infrastructure funding for Camarines Sur’s
The Office of the Vice President (OVP) denied any connection between its “Pagbabago: A Million Trees
Up to 1,500 residents in Baguio City benefited from the Laboratoryo, Konsulta at Gamot para sa
Mamayang Liberal Party-list Rep. Leila de Lima has urged President Marcos to immediately declare a state
More than 600 cyclists joined the fifth edition of Padyak Pasay: Pedal Forward 2026 on Saturday,
