Detained contractor Sarah Discaya is set for arraignment on Jan. 13 before the Regional Trial Court Branch 27 in Lapu-Lapu, Cebu, on charges of graft and malversation linked to P96.5-million “ghost” flood control projects in Davao Occidental.
She was arrested by the NBI on Dec. 18 and flown to Cebu the following day, where she is currently detained.
Discaya, her niece Ma. Roma Rimando and six others are implicated in the alleged fraudulent projects.
Pasig Mayor Vico Sotto alleged that the Discayas’ camp has been threatening former employees to prevent them from testifying.
Sotto also emphasized the scale of their operations, noting billions of pesos in transactions linked to their companies, and urged the public to stay vigilant as the cases proceed.
Source: PhilNews24 | December 22, 2025
Latest from News
Damage from the southwest monsoon and tropical cyclones Luis and Maymay has reached P4.02 billion, with
Angat Dam’s water level rose to 181.87 meters, nearly two meters above its minimum operating level,
The Motorcycle Taxi Rider Association (METRO) backed the LTFRB’s efforts to clean up and professionalize the
An additional P40 million has been earmarked this year to keep government-run VALOR clinics for Filipino
The Philippine Navy will join India and ASEAN navies in the ASEAN-India Maritime Exercise 2026 from
